Securing an innovation grant is only part of funding research and development (R&D). Businesses will also need to consider their own contribution, payment timings, eligible costs, and whether other forms of support, such as the R&D Tax Credit, may be relevant.

In this guide, we explore seven leading R&D and innovation funding routes, who they’re suited to, and how they can fit into a wider innovation funding and tax strategy.

R&D Grants & Innovation Funding at a Glance

Short on time? Here’s a quick overview of what businesses need to know about R&D grants and innovation funding before exploring the guide in more detail.

Key points:

  • What are R&D grants? Usually competitive, non-repayable awards that contribute towards the cost of eligible innovation projects, although your business may still need to fund part of the project itself.
  • What funding is available? Key options include Enterprise Ireland, Horizon Europe, Knowledge Transfer Partnerships (KTPs), Eurostars, and regional or sector-specific innovation grants.
  • Who can apply? Eligibility varies between programmes and may depend on your business size, location, sector, project stage, and whether you’re applying independently or with partners.
  • How much funding could you receive? There’s no standard amount – grant rates typically range from 25% to 70% of eligible project costs, depending on the programme, your business size, and project stage. Some competitions also set their own total funding caps.
  • When should you apply? Ideally, start looking for funding before your project begins, as competitions can have specific rules around project start dates and eligible expenditure.
  • Can grants work alongside the R&D Tax Credit? Potentially. Receiving grant funding doesn’t automatically prevent an R&D Tax Credit claim, and vice versa, although how the two interact will depend on your circumstances and the applicable rules.

Bottom line: There’s no single R&D grant that’s right for every business. Focus on finding funding that genuinely fits your project, then consider how it could work alongside other innovation incentives as your business develops.

What are R&D grants?

R&D grants are usually competitive (meaning they’re awarded through an application process) and are non-repayable awards that fund part of an eligible innovation project.

Depending on the specific scheme, businesses may use this funding to cover costs such as:

  • Feasibility studies (e.g. assessing whether a new technical approach is viable)
  • Staff wages (e.g. salaries for engineers or researchers working on the project)
  • Product development (e.g. designing and building a new software tool or physical product)
  • Prototyping (e.g. creating an early working model to test a concept)
  • Materials and testing (e.g. lab consumables or components used during trials)
  • Subcontractors and specialist expertise (e.g. hiring a specialist consultant or test facility)
  • Collaboration with universities, research organisations, or other project partners (e.g. co-developing a solution with a university research team)

The proportion of funding available depends on the specific competition, the size of the business, and the nature of the project. Each competition has its own eligible cost rules, funding limits, and applicant contribution requirements.

Therefore, it’s a good idea for businesses to review the terms of each opportunity carefully before committing time and resources to an application.

Are R&D grants the same as innovation grants?

There’s a significant overlap between the two terms. “R&D grant” usually emphasises research and development activities intended to resolve technical or scientific challenges. This could include feasibility work, prototyping, or testing.

Meanwhile, an “innovation grant” may have a broader scope. As well as R&D, it may support collaboration, demonstration, commercialisation, adoption, or the development of new business models and services.

Funding bodies may use either term depending on the objectives of the programme, so businesses should focus on the competition’s scope and eligibility criteria rather than its title alone.

Comparing R&D and innovation funding routes

There’s no single R&D grant that suits every business. The right funding route depends on factors such as the stage of development your project is at, whether you need to work with other organisations, your industry, and where your business is based.

The table below summarises seven of the most common innovation funding routes. We’ll explore each in more detail later in this guide.

Funding routeBest forCollaboration required?Typical applicants
Enterprise Ireland funding competitionsBusinesses developing innovative products, services or processesSometimesIrish businesses, from startups and SMEs to larger companies
Horizon EuropeLarge-scale research and innovation projects with an international focusUsuallyBusinesses, universities, research organisations and consortium partners
Knowledge Transfer Partnerships (KTPs)Businesses looking to access academic or specialist expertiseYesIrish businesses working with a university, college, or research organisation
EurostarsInternational, commercially focused R&D projects led by innovative SMEsYesR&D-performing SMEs and international project partners
Regional innovation grantsBusinesses looking for funding linked to their locationVariesBusinesses meeting regional or local eligibility criteria
Sector-specific and local innovation grantsProjects aligned with a particular VariesBusinesses operating in eligible sectors or locations

Although these funding routes all support innovation, they differ significantly in their objectives, eligibility criteria, and funding rules.

Some focus on early-stage feasibility studies, while others are designed to accelerate commercialisation, encourage collaboration across businesses, and positively impact regional economic growth.

Before preparing an application, it’s worth considering not only which programme best aligns with your project, but also how grant funding could fit alongside other innovation incentives, such as R&D Tax Credit or Knowledge Development Box, as your business grows.

Although these funding routes all support innovation, they differ significantly in their objectives, eligibility criteria, and funding rules.

Some focus on early-stage feasibility studies, while others are designed to accelerate commercialisation, encourage collaboration across businesses, and positively impact regional economic growth.

Before preparing an application, it’s worth considering not only which programme best aligns with your project, but also how grant funding could fit alongside other innovation incentives, such as R&D Tax Credit or Knowledge Development Box, as your business grows.

7 well-established R&D and innovation funding options for Irish businesses

Businesses have more innovation funding options available to them than many realise, and the right fit will depend on your project, sector, stage, and whether you’re working independently or with partners.

Below, we’ve highlighted seven well-established funding options worth exploring, with a closer look at Enterprise Ireland and Horizon Europe for businesses pursuing more ambitious R&D programmes. These aren’t the only options available, but they represent some of the most accessible and commonly used across businesses.

1. Enterprise Ireland funding competitions

What it is: The national innovation agency running regular open competitions to co-fund businesses developing new or improved products, processes, and services.

Best suited to: Businesses in manufacturing, digital, engineering, construction, agriculture, life sciences, or clean energy that are actively developing something new, rather than just improving existing processes.

What it can fund: Feasibility studies, industrial research, experimental development, and collaborative innovation programmes.

Typical funding: Grant rates vary depending on company size, project stage, and the specific call. SMEs may receive higher rates than larger companies.

Key watch-out: Each funding call has its own scope and eligibility rules, so it’s a good idea to check the specific competition guidance before committing time to an application.

Enterprise Ireland is the national enterprise development agency.

Through regular competitive funding calls, it supports businesses developing innovative products or services across a range of sectors, including manufacturing, digital technologies, engineering, construction, agriculture, life sciences, and clean energy.

Funding calls vary throughout the year, but commonly fund activities such as feasibility studies, industrial research, and collaborative innovation programmes.

Since each call has its own scope, eligibility criteria, and funding rates, it’s a good idea to review the guidance before deciding whether to apply. You can find current open calls on the Enterprise Ireland website.

2. Horizon Europe

What it is: The European Union’s flagship research and innovation programme. Ireland is a full member of Horizon Europe, meaning eligible Irish organisations can collaborate with partners across Europe on ambitious research and innovation projects.

Best suited to: Businesses tackling large-scale technical challenges or looking to build international research partnerships, often working alongside universities, research organisations, and industry partners.

What it can fund: Ambitious, collaborative R&D projects with commercial and societal impact.

Typical funding: Can vary by project and funding call. Funding rates and grant values differ significantly across Horizon Europe programmes.

Key watch-out: Projects typically require collaboration with partners in other participating countries. The application process is more involved than most national competitions.

Horizon Europe is the European Union’s flagship research and innovation programme. Ireland is a full member, meaning eligible Irish organisations can collaborate with partners across Europe on ambitious research and innovation projects.

The programme is particularly well suited to businesses tackling large-scale technical challenges or looking to build international partnerships. Projects often involve universities, research organisations, and industry partners working together to deliver innovation with commercial and societal impact.

3. Knowledge Transfer Partnerships (KTPs)

What it is: A government-backed programme that funds a collaboration between your business and a university, college, or separate research institution, typically through placing a qualified graduate (an “Associate”) in your business to lead a defined innovation project.

Best suited to: Businesses that need specialist technical or research expertise they don’t have access to in-house, especially those looking to develop new products, services, or processes over a 1-3 year period.

What it can fund: The cost of the Associate’s salary, plus academic supervision, travel, and some project materials. The business contributes a proportion of the total cost.

Typical funding: Businesses typically contribute around 33% of total costs (less for smaller businesses), while the remainder is funded by the grant.

Key watch-out: KTPs are a longer-term commitment compared to a typical grant competition. You can explore options via Enterprise Ireland or the KTP programme pages.

Need specialist expertise that your business doesn’t have in-house? A Knowledge Transfer Partnership (KTP) connects your business with a university, college, or research institution, and funds a highly qualified graduate (known as an Associate) to work in your business and lead a defined innovation project.

So you’re not just gaining access to academic expertise; you’re getting a funded member of staff, supervised by a university team, working exclusively on your project for 1-3 years. Grant funding covers the Associate’s salary, the academic team’s time, project materials, and travel. SMEs typically contribute around 33% of total costs, with the remaining 67% grant funded.

KTPs support the development of new products, services, processes, and are particularly well suited to businesses tackling a specific technical challenge they can’t solve alone.

To explore options and find a knowledge base partner, visit the Enterprise Ireland KTP guidance pages.

4. Eurostars

What it is: An international funding programme supporting innovative SMEs working with partners in other participating countries to develop commercially focused R&D projects.

Best suited to: SMEs looking to access new expertise, enter international markets, or collaborate on ambitious innovation projects with overseas partners.

What it can fund: Collaborative, market-driven R&D projects aimed at bringing new technologies or solutions to market.

Typical funding: Grant rates and values vary by country, but Irish participants are funded through Enterprise Ireland as part of the Eurostars programme.

Key watch-out: You must have at least one partner in another Eurostars participating country, and the lead partner must be an SME.

If you’re looking to collaborate internationally, Eurostars could be worth exploring. The programme is specifically designed for innovative SMEs, supporting them to work with partners in other participating countries on commercially focused R&D projects that bring new technologies to market.

It’s particularly well suited for businesses looking to access new expertise, enter international markets, or take on ambitious innovation projects with overseas partners.

Irish-based participants can receive a grant of up to 60% of eligible project costs, capped at approximately €360k per partner. Funding is administered through Enterprise Ireland as part of the country’s involvement in the Eurostars programme.

5. SFI and IRC research funding

What it is: Science Foundation Ireland (SFI) and the Irish Research Council (IRC) fund research and innovation projects across a range of scientific and technical disciplines.

Best suited to: Businesses working in partnership with research institutions on projects with a strong scientific or technical basis, particularly in sectors such as life sciences, ICT, engineering, and energy.

What it can fund: Collaborative research projects between businesses and academic institutions, including co-funded industry partnership programmes.

Typical funding: Varies by programme and call. Both SFI and IRC run a range of schemes at different funding levels.

Key watch-out: Many programmes require collaboration with an Irish research institution. Check individual call requirements before applying.

SFI and IRC support research and innovation projects across a range of scientific and technical disciplines, with a particular focus on collaboration between businesses and academic or research institutions.

SFI tends to focus on larger-scale strategic research, particularly in life sciences, ICT, and energy. The IRC supports a broader range of disciplines, including industry partnership schemes that bring academic expertise into commercial settings.

Funding varies by programme and call. To find current open calls and industry partnership opportunities, visit the Science Foundation Ireland and Irish Research Council websites directly.

6. Regional innovation grants

What it is: Innovation grants offered through regional and local organisations that are separate from national programmes like Enterprise Ireland.

Best suited to: Businesses of any size looking for funding aligned to their region’s economic priorities, or those that may not meet the criteria for national competitions.

What it can fund: Varies by region and programme. Can cover similar costs to national grants, including R&D activity, feasibility work, and product development.

Typical funding: Fluctuates greatly, and smaller grants are common at regional level. Funding amounts and availability change regularly.

Key watch-out: Opportunities vary significantly by location. Start with your Local Enterprise Office (LEO), Enterprise Ireland, or your regional development body to see what’s currently available.

Innovation funding isn’t limited to national competitions. Depending on where your business is based, you may also be able to access grants through your Local Enterprise Office other regional bodies.

Funding varies by location and changes regularly, so it’s worth checking regional opportunities alongside national programmes such as Enterprise Ireland.

7. Sector-specific and local innovation grants

What it is: Targeted funding programmes designed for businesses in specific industries (such as software & IT, manufacturing, construction, engineering, or agriculture), delivered by local authorities, universities, or industry bodies.

Best suited to: Businesses whose project aligns closely with a particular sector or regional priority, as these grants are often less competitive than national programmes due to their narrower focus.

What it can fund: Innovation activity relevant to the specific sector or community the grant is designed to support.

Typical funding: Varies widely by programme and funder.

Key watch-out: These grants are more targeted, which means eligibility criteria can be strict. Check with your industry body or local authority to find relevant opportunities.

Some funding programmes are designed for businesses operating in specific industries, such as:

Others are delivered by local authorities, universities, or industry bodies to encourage innovation within their communities.

While these grants are often more targeted than national competitions, they can be an excellent option if your project aligns with a particular sector or regional priority.

Not sure which innovation funding route is the best fit? The table below compares each programme based on your project type, helping you narrow down the most suitable option before you start an application.

Infographic matching seven Irish innovation funding options to business goals: Enterprise Ireland, Horizon Europe, Knowledge Transfer Partnerships, Eurostars, SFI and IRC, Regional Innovation Grants, and Sector-Specific Innovation Grants.

Figure 1: The right funding option depends on your project goals, sector, and whether you plan to collaborate. From Enterprise Ireland to Horizon Europe and sector-specific grants, each scheme supports different types of innovation activity.

Which R&D grant is right for your business?

With so many options available, choosing the right R&D grant can feel like a challenge in itself. The best fit will depend on what you’re developing, where your business is based, who you’re working with and what stage your project has reached.

Use the table below as a starting point:

If you’re looking to…Funding route to explore
Develop an innovative product, service, or processEnterprise Ireland
Take part in a large-scale international R&D projectHorizon Europe
Access specialist expertise from a university or research organisationKnowledge Transfer Partnerships (KTP)
Collaborate with international partners as an innovative SMEEurostars
Access research funding in science, technology, or life sciencesSFI and IRC
Find funding based on where your business operatesRegional innovation grants
Find funding targeted at your industrySector specific innovation grants

Who is eligible for an R&D grant?

There’s no universal eligibility test for R&D grants. Each funding body and competition sets its own requirements, so being eligible for one doesn’t necessarily mean you’ll qualify for another.

Depending on the opportunity, eligibility may be influenced by:

  • The size and location of your business
  • Your sector
  • The type and stage of your project
  • Whether you’re applying alone or with partners
  • The level of innovation involved
  • Your ability to fund your share of the project costs

Some programmes are open to businesses of all sizes, while others specifically target SMEs, particular sectors, or collaborative projects.

Before you start writing an application, check the eligibility criteria carefully. There’s little value in spending hours preparing a bid for a competition that isn’t a good fit.

What costs can an innovation grant cover?

What you can claim will depend on the funding programme and the type of project you’re undertaking.

Eligible costs may include:

  • Staff working directly on the project
  • Materials and consumables
  • Prototyping and testing
  • Subcontractor costs
  • Specialist equipment or facilities
  • Travel associated with the project
  • Costs associated with project partners

However, don’t assume that every project expense will be covered. Funding bodies usually set clear rules around eligible costs, and you may need to explain and justify them as part of your application.

It’s also worth remembering that the costs accepted under an innovation grant aren’t necessarily the same as those that qualify for the R&D Tax Credit. If you’re considering both, look at the two sets of rules separately.

How much funding can a business receive?

There’s no single answer, as the amount of R&D funding available varies considerably between programmes.

Some grants are designed to support smaller feasibility projects, while larger collaborative programmes can provide significantly more funding for ambitious, multi-year R&D projects.

The grant may also only cover a proportion of your eligible project costs. How much you’ll need to contribute yourself can depend on factors such as:

  • The funding programme
  • Your business size
  • The type of R&D being carried out
  • Whether you’re working with other organisations

Rather than choosing an opportunity based on the headline funding figure alone, consider how much you’ll actually receive, what you’ll need to contribute and when payments will be made.

When should you look for R&D funding?

Ideally, start exploring funding opportunities before your project gets underway. Many grants have specific rules around project start dates and eligible expenditure, and application processes can take time.

Planning ahead also gives you more time to find the right competition, understand what you’ll need to contribute and consider how grant funding could fit alongside other forms of innovation support.

How to apply for an R&D grant

Found a funding opportunity that looks promising? Before jumping straight into the application, make sure your project genuinely fits what the funder is looking for.

While every application process is different, you’ll typically need to:

  • Check the scope and eligibility criteria. Make sure your business and project meet the requirements before investing time in an application.
  • Define your innovation. Be clear about what you’re developing, what’s innovative about it and the challenge you’re trying to overcome.
  • Build your project plan. Set out what you’ll do, when you’ll do it and who will be responsible.
  • Prepare your costs. Create a realistic project budget and check which costs the funder will accept.
  • Explain the commercial opportunity. Show that there’s a genuine market need and a route to commercialisation.
  • Review before submitting. Check your answers against the assessment criteria rather than simply describing why you think the idea is good.

Give yourself plenty of time. Competitive grant applications can require significant technical, commercial and financial detail, and rushing the process rarely helps.

Six-step infographic on applying for an innovation grant in Ireland: check eligibility, define your innovation, build your project plan, prepare your budget, make the commercial case, and review against the criteria.

Figure 2: A strong application covers eligibility, a clear innovation definition, a credible project plan, a realistic budget, and a commercial case, whether you’re applying to Enterprise Ireland or any other scheme.

What makes a strong R&D grant application?

A great idea is important, but it isn’t enough on its own. Assessors also need to understand why the project deserves funding and whether your business is capable of delivering it.

What assessors are looking for

While the criteria will vary between funding programmes, assessors will typically want to understand:

  • The problem you’re solving: Is there a genuine technical, commercial, or societal challenge that needs addressing?
  • What’s innovative about your approach: How does your proposed solution differ from what’s already available?
  • The market opportunity: Is there evidence of demand, and is there a realistic route to commercialisation?
  • Your project plan: Are the timescales, costs, and resources realistic?
  • Your team: Do you and your project partners have the right skills and experience to deliver the work?
  • The risks involved: Have you identified the main technical and commercial risks and explained how you’ll manage them?
  • Why funding is needed: What difference will the grant make to the project, and what could happen without it?

Above all, make it easy for the assessor to understand your case. Answer the questions directly, back up your claims with evidence where possible, and don’t assume the person reviewing your application will have the same technical knowledge as you.

Common reasons R&D grant applications are rejected

Grant funding is understandably competitive, and even genuinely innovative projects aren’t guaranteed to succeed.

Applications can fall short for relatively simple reasons, such as:

  • The project doesn’t closely match the competition scope
  • The innovation isn’t clearly explained
  • There’s limited evidence of market demand
  • The project plan or budget isn’t realistic
  • Risks haven’t been thoroughly considered
  • The commercial opportunity is unclear
  • The application doesn’t directly address the assessment criteria

It’s a good idea to try reading your application from an assessor’s perspective before submitting it. Can someone unfamiliar with your business quickly understand what you’re developing, why it matters, and why funding would make a difference?

R&D grants versus the R&D Tax Credit

R&D grants and the R&D Tax Credit both support business innovation, but they work in different ways.

A grant provides funding towards an approved project, usually following a competitive application. The R&D Tax Credit, on the other hand, is a Corporation Tax incentive available to companies carrying out qualifying R&D activities and meeting the relevant conditions.

QuestionR&D grantThe R&D Tax Credit
When is support received?During or around the project, depending on the funding termsAfter qualifying expenditure has been incurred and a claim is made
Is it competitive?UsuallyNo, but statutory eligibility requirements apply
Does it need repaying?Generally no, if the funding conditions are metNo, though claims may be checked by Revenue
Is funding project-specific?UsuallyBased on qualifying R&D activities and expenditure
Can both apply?PotentiallyThe interaction depends on the circumstances and applicable rules

Can you receive an R&D grant and claim the R&D Tax Credit?

Potentially, yes. Receiving grant funding doesn’t necessarily prevent a business from claiming the R&D Tax Credit.

However, the interaction between the two can be complex. The treatment will depend on factors including the funding received, the expenditure involved, and which R&D Tax Credit rules apply to your accounting period.

Why early planning makes the difference

That’s why it’s worth considering your tax position alongside your funding strategy rather than looking at the two in isolation. Planning early can help you understand how different forms of support may interact and make sure you’re keeping the records you’ll need later.

Want to know what your business could claim? Our guide to R&D Tax Credits explained covers how the current schemes work, which activities and costs may qualify, and what businesses need to consider when making a claim.

Is there tax support once your innovation starts generating profit?

The support available to your business doesn’t stop once development is complete. There are tax reliefs specifically designed for the stage when your innovation starts generating profit.

While grants can help fund the development of an innovation and R&D Tax Relief can support qualifying R&D expenditure, Knowledge Development Box may become relevant when patented innovations begin generating qualifying profits.

Eligible companies can elect into Knowledge Development Box to apply a reduced rate of Corporation Tax to qualifying profits associated with patented inventions and certain other qualifying intellectual property.

Not every R&D project will result in a patent or qualify for Knowledge Development Box. But if you’re developing potentially patentable technology, considering your intellectual property strategy early could put your business at an advantage further down the line.

Where to find current R&D funding opportunities

Innovation funding is a fast-moving landscape. Competitions open, close, and change scope throughout the year, so an opportunity that’s available to you today may not be there when you come to apply.

Useful places to keep an eye on include:

  • Enterprise Ireland: funding competitions and open calls
  • Enterprise Ireland Funding Finder: browse current opportunities
  • Horizon Europe: European research and innovation opportunities
  • EU Funding & Tenders Portal: where proposals are submitted
  • SFI: Science Foundation Ireland funding calls
  • Irish Research Council: IRC funding programmes
  • Your Local Enterprise Office: regional and local opportunities
  • Local authorities, universities, and industry bodies for sector-specific opportunities

Rather than waiting until you need funding, it’s worth keeping an eye on new opportunities. Finding the right competition early gives you more time to assess whether it’s a good fit for your business, develop your project, and put together a strong application.

Innovation funding FAQs 

Businesses can access R&D grants and innovation funding through programmes including Enterprise Ireland competitions, Horizon Europe, Knowledge Transfer Partnerships, Eurostars, SFI, and IRC, as well as regional and Local Enterprise Office initiatives.

What’s available will depend on your project, business, sector and location, and funding opportunities change throughout the year.

Yes, certainly. Many R&D and innovation grants are open to SMEs, and some programmes are specifically designed with smaller businesses in mind.

That said, eligibility varies between competitions, so check requirements around business size, location, project costs, and collaboration before applying.

Usually, innovation grants are non-repayable provided you meet the terms and conditions of the funding.

That doesn’t necessarily mean the grant will cover everything. Your business may need to contribute towards project costs, provide evidence of expenditure, and meet agreed milestones throughout the project.

Yes. Startups can potentially access R&D funding if they meet the requirements of the relevant programme.

Funders will usually want to see more than a promising idea. You’ll need to demonstrate a credible innovation project, a clear technical or commercial opportunity, and your ability to deliver what you’re proposing.

It depends on the funding programme, but businesses are often expected to contribute towards the project themselves.

The proportion funded can depend on a few different factors, such as:

  • Your business size
  • The type of R&D being undertaken
  • The specific competition rules

Check the funding rate before applying so you know what your business will need to contribute.

Potentially. Receiving a grant doesn’t automatically prevent a company from claiming the R&D Tax Credit.

However, the interaction depends on your circumstances, the expenditure involved, and the R&D Tax Credit rules that apply.

The timeframe varies. Some funding programmes have relatively straightforward application processes, while major Enterprise Ireland or Horizon Europe opportunities can require detailed technical, commercial, and financial submissions.

Remember to factor in the time between preparing your application, submitting it, receiving a funding decision, and the proposed project start date. Looking at the full timeline will give you a much more realistic idea of when funding could become available.

Enterprise Ireland runs different funding competitions throughout the year rather than offering one permanently open grant.

Check the latest Enterprise Ireland funding opportunities to see what’s currently available. If there isn’t a suitable competition today, it’s worth checking regularly as new opportunities are launched.

Sign up to our Newsletter

Stay ahead with the latest R&D tax insights, funding updates, and innovation trends - straight to your inbox.

    Recent insights

    Ready to discuss your unclaimed R&D Tax Credits?

    Complete the form to request a call from one of our consultants or click here to send us a message.